How to do the toilet waterproof, do these steps waterproof and leakproof.

1. Preparation: First clean the bathroom, clean the ground, walls, pipes, and other debris, and ensure that the surface is dry and clean. 
2. Fill gaps: Use silicone sealant or caulk to fill gaps between the ground and walls and pipes, ensuring that there are no openings. 
3. Bottom treatment: Paint waterproof base coating on the ground and wall, and the coating should be evenly extended to the junction between the ground and the wall, such as the connection between the floor tile and the wall tile, and the connection between the ground and the toilet, the bathtub and other equipment. 
4. Positive Angle treatment: Protect the inner and outer positive angles with waterproof treatment materials, such as using polymer waterproof coating, waterproof film, etc., to ensure that there will be no water seepage at the positive Angle. 
5. Floor drain treatment: Paint waterproof paint around the floor drain to ensure that there is no water leakage between the floor drain and the ground. 
6. Pipeline treatment: Wrap the pipeline in the bathroom with waterproof paint or waterproof film to ensure that the pipeline will not leak. 
7. Waterproof coating: Coating waterproof coating is a key step in the waterproofing of the bathroom. Use polymer or cement-type waterproof paint, apply according to the instructions, and ensure that the paint adheres evenly to the floor and wall, and has a certain thickness. 
8. Pay attention to details: In the process of painting the waterproof layer, pay attention to the special parts of the bathroom for waterproof treatment, such as the sink, toilet, and other equipment connections, sockets on the wall, switches, etc. Make sure every detail is waterproofed. 
9. Waterproof layer drying: After the waterproof layer is painted, wait enough time according to the product instructions to allow the waterproof layer to dry fully. 
10. Plastering or tile laying: After the waterproof layer is dry, the next step can be carried out, such as plastering, tile laying, etc.